Not sure if anything is actually needed. It just looks unstable. Power is already run to the shed, so it might be difficult to move and do a full concrete pour. I was thinking of lifting with a car jack and finding a better combination of pavers to remove the wood wedges, but I’m open to any ideas. And it is on a slope, the other end is on pavers on the ground. This stack of pavers was the previous owners attempt at levelling I guess.
good plan, but dont forget you’ll need to disconnect the power while jacking it up - might wanna check out portable power stations on gearscouts.com to keep any tools/lights running during the project.