If you don’t build with cardboard this problem is very easy to solve, its called putting a goddam Pond liner between the dirt and the structure itself.
And the weigh isn’t a issue with low buildings, say 10 to 20 floor that aren’t made from cardboard, and higher than that is inefficient in all regards anyway and should be avoided.
If you don’t build with cardboard this problem is very easy to solve, its called putting a goddam Pond liner between the dirt and the structure itself.
And the weigh isn’t a issue with low buildings, say 10 to 20 floor that aren’t made from cardboard, and higher than that is inefficient in all regards anyway and should be avoided.